How Long Should a Bathroom Remodel Take?

How long does it take to remodel a bathroom? What is the average bathroom remodel timeline? Read on to find out here.

How Long Should Bathroom Renovation Take? Planning a bathroom projectHow Long Should Bathroom Renovation Take? Planning a bathroom project

Home improvements can help increase the resale value of a property and also make your home feel more like a home. A great way to improve your home is to remodel your bathroom.

But it's always good to know everything you can about bathroom remodeling before you do it. Read on to find out how long it takes to remodel a bathroom and what to expect.

How Long Does It Take to Renovate a Bathroom?

Remodeling your bathroom is no quick task. So if you’re expecting the answer to the question ‘how long does it take to do a bathroom remodel’ to be a few days, then you might be in for a shock.

On average, a bathroom renovation can take more than 20 daysSome bathroom remodels can take longer than a month to complete, depending on certain factors.

Factors That May Affect Renovation

There are several factors that affect how long it takes to remodel a master bathroom.

One factor that affects the time is the size of the bathroom. Smaller bathrooms will take less time to complete than larger bathrooms.

Another factor to consider is the extent of the remodel. For example, if you want to remove everything and start from scratch, that will take longer than just adjusting a few things in your bathroom.

Another factor that will affect the length of time it takes to remodel your bathroom is whether you will do it yourself or bring in contractors.

If you don't know what you're doing, doing it yourself can take even longer. Hiring contractors for plumbing, flooring, and electrical work can take a considerable amount of time, depending on their flexibility and how well you can plan for each of them to arrive.

Another factor that can affect how long it takes to completely remodel a bathroom is whether the materials you want are available in-store or online. Materials that need to be custom-made or special-ordered will take longer to be ready. For example, some glass shower doors may need to be customized to fit your bathroom or shower.

What to Expect: Bathroom Remodel Timeline Guide

Every bathroom renovation is different and can take longer than expected. However, to give you an idea of ​​what to expect, check out our rough guide to your renovation timeline.

Step 1: Demolition

The first thing to expect from a bathroom remodel is the demolition of the existing bathroom. Bathroom demolition will include site preparation, preserving the floor and the rest of the house, and removing anything you no longer need. This will take about 1 to 2 days.

Step 2: Installing the Foundations

Once the demolition is complete, the next two days will be used to transform the design of the bathroom. This includes the plumbing and electricity of basic things like the bath and/or shower. During these two days, you can also expect fans and ventilation systems to be installed.

Step 3: Drywall

Once the basic parts of the bathroom are in place, the contractor team or yourself can focus on installing drywall to set the layout of the bathroom.

This process will also include installing damp-proof boards around the bath or shower. Expect the drywall to take up to five days, perhaps longer, depending on how long it takes to dry.

Step 4: Laying

Now that all the walls are in place, you or your contractors can start laying the tiles. Depending on the size of the bathroom and the drying conditions of the room, the installation can take up to a week. In addition to tiling, the tiles must also be grouted and sealed to prevent water from seeping into them.

Once the tiles are in place, you can paint and prime the rest of the bathroom walls with the first coat. More coats can be added later if necessary. If the tiles take longer to dry, tiling can take up to a week or more.

Step 5: Final Touches

The finishing touches are then put on the bathroom, such as the countertops, toilets and sinks. The plumbers and electricians will install the foundations of your bathroom and check that they are working properly.

Other finishing touches include adding a few more coats of paint and installing a towel rack. The finishing touches phase can take two to four days, depending on how much more work you want done.

Step 6: Audits

Once everything is in place and to your liking, you need to make sure it passes inspections. Contractors will inspect any work that may be useful, such as plumbing and electrical work, to make sure it is in good working order.

They or you should also clean the area and make sure it is ready for use. This may take a day or two, depending on the work that needs to be done and the amount of debris that needs to be cleaned up.

Transform Your Bathroom

Now that you know the answer to 'how long does it take to remodel a bathroom', you have no excuse to keep your bathroom dull and tired. Find local bathroom remodeling professionals to help you transform your bathroom today.

If you enjoyed this article, be sure to check out some of our other small design ideas. From bathrooms to kitchens, our blog features the biggest and latest tips and tricks to help you renovate your home.

Ocean

Meet our Editor Ocean In our blog, Ocean shares the most innovative ideas in the field of decoration. With years of experience, Ocean combines aesthetics and functionality to present you with the latest trends and timeless designs. Discover how you can transform your spaces with creative inspiration and practical solutions. Thank you for visiting us and sharing our passion for design!

Leave a Reply

Your email address will not be published. Required fields are marked *

Back to top button